Page 9 - HeavyMetal
P. 9

Flow Chart



            Round Bar               Hydro Testing           Final Cutting











            Hot Finish             Heat Treatment of      Surface Treatment
         Hollow Preparation         U Bend Portion
                                     (if required)








            Hollows /
           Mother Tubes               U  Bending         Visual & Dimension
                                     (if required)           Inspection











         Surface Treatment          Destructive Test          Marking










            Drawing /             Non-Destructive Test        Packing
             Pilgering












          Heat Treatment           Physical Chemical          Dispatch
                                    & Mockup Test









           Straightening               Cutting
   4   5   6   7   8   9   10   11   12   13   14